Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13775300

- Product Categories
- Friendly Links
Information Name: | UGM grout manufacturers Xi'an |
Published: | 2015-05-25 |
Validity: | 0 |
Specifications: | |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | 24 hours factory Tel: 15289381573 QQ: 603657608 I. Introduction of high-strength non-shrink grout grout optimized product production process, the use of modern research and development of new materials from the series filled with potting material. With a self-leveling, vibration-free, super-early-strength, high-strength, micro-expansion, anti-shrinkage, anti-infiltration and anti-wear, anti-aging properties and a variety of functionality. Easy to operate, widely used. In various equipment installation and engineering repair, reinforcement construction, the application of the product can significantly speed up the progress, improve project quality. After hours watering viable people, traffic, 24 hours to meet the design intensity of use, can be installed and running ahead of schedule or resume production. Second, the cement-based high-strength non-shrink grout is mainly used for: 1, the fixed reinforcement class, anchor bolts, nuclear power equipment, road and bridge engineering reinforcement, plant buried reinforced concrete structure reinforcement and reconstruction, static piling engineering pile seal . 2, installation category. Installation of power plants and other mechanical and electrical equipment, cement mill installed cement grout, grout secondary grouting mine equipment installation, rail and installation of steel structures, machine base, steel structure and foundation Huai mouth, equipment foundation. 3, repair works category. Thickening and leakage of water seepage wall structure repair, grouting and collapse runway repair, all kinds of repair works and other infrastructure projects, the cracks in old concrete structure of governance. Third, the product features 1, early strength, high strength. After pouring more than 1-3 days strength of up to 30Mpa, shorten the construction period. 2, good gravity performance. Scene just add water and stir, directly poured into the device, based mortar gravity, vibration-free construction, to ensure that no vibration, long distance grouting construction. 3, micro-expansion. Long-term use of non-shrink casting body to ensure that the equipment and infrastructure in close contact, no shrinkage between the base and foundation, and appropriate expansion stress to ensure long-term safe operation of equipment. 4, anti-oil seepage. 30 days immersed in the oil intensity increased by 10%, molded, dense, impervious, base oil and adapt to the environment. 5. durability. 2,000,000 times fatigue test, 50 freeze-thaw environmental testing strength no significant change. 6, the weather is good. -40 ℃ ~ 600 ℃ long-term safe use. 7, low-alkali corrosion. Strict control of raw materials alkali content for alkali - aggregate reaction inhibition requirements of the project. Fourth, the construction step 1, basic treatment: the base surface cleaning equipment, without gravel, laitance, dirt, grease and mold release agents and other debris. Grouting before 24h, basic equipment should be fully wet surface. Before filling 1h, should sucking water. 2, the device according to the actual situation stands, select the appropriate grouting methods: Because CGM has good flow properties, under normal circumstances, with "Law filling weight" to the upcoming slurry poured into the mouth directly from the template, totally dependent self-respect and self-leveling slurry to fill the entire space perfusion; if perfusion is large in size, structure is particularly complex or small space and very far away, you can use "high filling funnel Law" or "pressure grouting method 'grouting, in order to ensure the slurry can be sufficiently filled every corner. 3, formwork: level should be higher than in accordance with certain grouting methods and grouting construction drawings support provided template, template positioning device base surface of at least 50mm, the template must support set tight, secure, prevent loosening, leakage of plasma. 4, stirred by the product certificate recommended ratio of water to material grout determine the amount of water: mixing water should be drinking water, water temperature 5 ~ 40 ℃ is appropriate, can be mechanical or manual mixing. When using mechanical stirring, stirring time is generally 1 to 2 minutes. Artificial agitation, advised two-thirds of water was added and stirred for 2 minutes, after adding the remaining water and continue stirring until homogeneous. 5. Filling: Filling construction should meet the following requirements: 1) slurry should be poured into the side, until the other side to overflow, in order to facilitate the discharge of air equipment base and concrete foundation, so filling enriched, shall from four side while grouting. 2) After filling start, we must be continuous, without interruption, and filling time should be as short as possible. 3) should not be vibrated, if necessary, and bamboo strips were pulled during the grouting process of diversion. 4) Each grout layer thickness should not exceed 100mm. 5) longer equipment or track-based grout should be used in the construction segment. Each length 10m appropriate. 6) Filling found during surface bleeding phenomenon can be a small amount of CGM dry material dispenser, dry water. 7) When the grout layer thickness is greater than 1000mm bulky equipment foundation grouting, the total amount of more than 1 may be stirred grouting material: 1 Add 0.5mm stone, but are subject to tests to determine whether its groutability can meet the requirements. 8) When the equipment foundation grouting is completed, the part should be removed before the final setting of the grout layer processing. 9) in filling up the construction process before the release, should avoid filling layer is subjected to vibration and impact, to avoid damage to the outstanding hard grout layer. 10) the level of the base template and equipment should be controlled at a distance of about 100mm, in order to facilitate grouting construction. 11) filling in as running plasma phenomena occur, promptly. 12) When the equipment foundation grouting is large, mechanical mixing method should be used to ensure the grouting construction. 6, after curing 1) filling is completed within 30 minutes, immediately curing compound or covered with plastic film and stamped with rockwool and other conservation, or immediately after the final setting of the grout layer sprinkler moisture conservation. 2) winter construction, conservation measures should also comply with the current "reinforced concrete construction Acceptance" (GB50204) the relevant provisions. 3) curing time and form removal schedule daily minimum temperature (℃) removal time at different temperatures (h) curing time (d) -10 ~ 0 96 14 0 ~ 5 72 10 5 ~ 15 48 7 ≥15 247 V. Packaging and storage: gray powder, with a plastic bag, net weight 50 kg / bag. The shelf life of six months, to be stored in dry and ventilated room. Six Dosage: The amount calculated by reference to the 2.2 to 2.4 t / m basis, calculate the actual usage. Seven grout Model: UGM-1, CGM, CGM-1, CGM-2, CGM-3, CGM-4, CGM-40, CGM-60, CGM-270, CGM-300, CGM-300A, CGM- 340, CGM-380, NVCGM, NVCGM-1, C40, C60, C80, HGM, HGM-1, HGM-2, HGM-3, HGM-4, CHM, H-40, H-50, H-60, H-70, H-80, RG, RG-A, RG-1, RG-2, RGM, BY-40, BY-50, BY-60, BY-70, BY-80, the company's main products: Filling materials; anchorage glue; Abrasive; bearing mortar; glue stick steel (potting compound); pouring glue; polymer repair mortar; epoxy mastic; epoxy repair mortar; grouting agent; pressure slurry; stick caking agent. Welcome to the new and old customers to inquire. 24 hours factory Tel: 15289381573 QQ: 603657608 |
Admin>>>
You are the 8905 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Building Materials Co., Ltd. far the world All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8905 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Building Materials Co., Ltd. far the world All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility